8th Ave Mixed Use
TopOut CM is acting as Construction Manager and Owner’s Rep
for this ground up project consisting of 90 residential units and retail space over 8
floors above grade and one below.
Project Details
- Client: Greenline Real Estate
- Project location: San Diego, California
- Project Size: ~75k Sf of BLDG area
- Construction budget: $24 Million
Services Performed
TopOut CM is acting as Construction Manager and Owner’s Rep for this ground up project consisting of 90 residential units and retail space over 8 floors above grade and one below. The project includes Type 1 and type 3 (modified) construction and features a roof-top pool. Construction is ongoing and the project is on schedule to be complete by June 2025.
Project Gallery
Browse our project gallery to see how we bring construction visions to life with excellence and precision.